JINXIN MACHINERY CO.,LTD
HomePage About Us Products Controller Characteristic Application Workshop Technique SalesOffice Service ContactUs
¡¡Technique£®£®£®
Daily
Checklist
Item Examination Breakdown situation Fixes the breakdown Note
Electric heating
piece
Whether burn outs

The temperature appears like heats up exceptionally or the ampere meter is motionless

Change the electric heating piece If has not traded restlessly shoots the material to be
Crank Whether oil cup has the oil The crank sound noise when switch mold Adds the gear oil The crank will experience acceleration
Cross spindle Whether oil cup has the oil Switch mold cross spindle voiced sound Add lubricating oil N/A
Holds the mold Whether oil cup has the oil Holds when the mold voiced sound Add lubricating oil N/A
Flowing tubing head pressure steel pipe Whether crosses the heat The operating time is long the time has the different heat Open the cooling water The hydraulic pressure components and the seal can
Safety device The flowing tubing head pressure electricity is whether safe The flowing tubing head pressure components or the electric appliance componnents have the damage constitution danger Trades the oil-pressure valve or the electric appliance limit switch Security problem is the first consideration
Monthly
Checklist
Movable base
holder
Dryly does not have lubricates The vehicle column is dry has not lubricated Adds the grease The aixs of the base holder will be
Flowing tubing head pressure motor rotating axis Dryly does not have lubricates Feeds in raw material when bearing voiced sound Adds the grease The aixs of the flowing tubing will be damage
Two-cylinder guide rle Dryly does not have lubricates Feeds in raw material guide role is dry has not lubricated Adds the grease The guide role will be damage
Main guide role and Dryly does not have lubricates Adjusts when the mold voiced sound Adds the grease Main guide role and gear will be
Optics rubler
(projects,switch
mold)
Cap nut and anchor screw The numeral cannot enull Screw,cap nut locking The switch mold feeds in raw material meets not normally
Electric appliance components The ash material powder moistens too many The contact is not good Air gun air flush The electric appliance components are easy to burn out
Checklist
Other
Movable base holder and fixed base holder Whether parallel The product has the fragments Readjusts 4-6 months
Chiller Whether the cooling pipe does stop up The lubricating oil exceptionally feels hot The steel pipe eliminates dirty 10-12months
Hydraulic oil Whether dirty or doesn't have the coherency The pressure is not normal Exchange the hydraulic oil 1-2years



++Copyright of Shanghai Jing Shing Machinery++